Gunnar Peterson has a post from Metricon about Bryan Ware's presentation about combining the effectiveness of a solution and the risk involved. I couldn't find the link to the actualy presentation. (I didn't have the time to go through them all.)

I think I would tie the effectiveness of the proposed security solution to the cost of capital of the overall project. It would be interesting to tie Bryan's work with my "work" on estimating the cost of capital for an information security project.